Step 36

  • Process : 4.5. Perform integrated change control.
     

  • Phase : Monitoring and Controlling.

  • Area   : Integration.

  • Documents of reference.

Download-2.png
Download-2.png
4.5.Perfom integrated change control.png

Perform Integrated Change Control is the process of reviewing all change requests; approving changes and managing changes to deliverables, organizational process assets, project documents, and the project management plan; and communicating their disposition.

 

It reviews all requests for changes or modifications to project documents, deliverables, baselines, or the project management plan and approves or rejects the changes.

 

The key benefit of this process is that it allows for documented changes within the project to be considered in an integrated fashion while reducing project risk, which often arises from changes made without consideration to the overall project objectives or plans.

The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the project manager.

 

The project management plan, the project scope statement, and other deliverables are maintained by carefully and continuously managing changes, either by rejecting changes or by approving changes, thereby assuring that only approved changes are incorporated into a revised baseline.

Changes may be requested by any stakeholder involved with the project.

Although changes may be initiated verbally, they should be recorded in written form and entered into the change management and/or configuration management system. Change requests are subject to the process specified in the change control and configuration control systems.

 

Those change request processes may require information on estimated time impacts and estimated cost impacts

 

Every documented change request needs to be either approved or rejected by a responsible individual, usually the project sponsor or project manager.

 

The responsible individual will be identified in the project management plan or by organizational procedures. When required, the Perform Integrated Change Control process includes a change control board (CCB), which is a formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions.

 

Approved change requests can require new or revised cost estimates, activity sequences, schedule dates, resource requirements, and analysis of risk response alternatives. These changes can require adjustments to the project management plan and other project documents.

 

The applied level of change control is dependent upon the application area, complexity of the specific project, contract requirements, and the context and environment in which the project is performed.

 

Customer or sponsor approval may be required for certain change requests after CCB approval, unless they are part of the CCB.

 

Configuration control is focused on the specification of both the deliverables and the processes; while change control is focused on identifying, documenting, and approving or rejecting changes to the project documents, deliverables, or baselines.


Some of the configuration management activities included in the Perform Integrated Change Control process are as follows:

 

* Configuration identification. Identification and selection of a configuration item to provide the basis for which the product configuration is defined and verified, products and documents are labeled, changes are managed, and accountability is maintained.    

 

* Configuration status accounting. Information is recorded and reported as to when appropriate data about the configuration item should be provided. This information includes a listing of approved configuration identification, status of proposed changes to the configuration, and the implementation status of approved changes.

 

* Configuration verification and audit. Configuration verification and configuration audits ensure the composition of a project’s configuration items is correct and that corresponding changes are registered, assessed, approved, tracked, and correctly implemented.

 

This ensures the functional requirements defined in the configuration documentation have been met.
 

13 Videos

How to make a Change Management Plan.

11-09-2018

Kotter´s 8-step change management model.

09-01-2017

Project change control defined.

10-06-2013

  • Source : ProjectManager.com , www

How to control change requests on a project ?

20-05-2013

  • Source : ProjectManager.com , www

What is Project Integration ?

08-05-2019

  • Source : Online PM course, Mike Clayton , www

What is Change Control ?

22-11-2017

  • Source : Online PM course, Mike Clayton , www

The cycle of change.

15-11-2017

  • Source : Online PM course, Mike Clayton , www

How to overcome resistance to change.

09-01-2017

How to fuel change.

25-08-2014

  • Source : ProjectManager.com , www

What is Change Management in Project Management terms ?

27-05-2013

  • Source : ProjectManager.com , www

Change Management process.

What is Change Management ?

31-01-2018

  • Source : Online PM course, Mike Clayton , www

Managing and leading change : A practical introduction.

15-11-2017

  • Source : Online PM course, Mike Clayton , www

4.5.Perform integrated change control (
4.5.Perform integrated change control (
  • Globe
  • LinkedIn
  • Twitter

2022 -- CL, inspired on PMBoK Guide 5.0, PMI©

bottom of page